Facade Repair Radar - home
Bronx · DOB data as of Oct 19, 2026

82 Bronx buildings have a SWARMP or UNSAFE facade report and no repair filed yet

Every building in Bronx whose first cycle 10 FISP report was rated SWARMP or UNSAFE, privately owned, with no repair filing or repair permit in public DOB data since the report (a sidewalk shed alone does not count as work). Re-checked every week - 14% of all open cases in New York City.

2 sidewalk sheds on open Bronx cases reach the LL48 penalty start (second permit renewal) in the next 90 days.1 reported Bronx facade got a repair filing or permit in the week to Oct 19 and now counts as work under way.Any firm in the Bronx can subscribe, including the ones you bid against.

Art Deco apartment building on the Grand Concourse with a sidewalk shed in late-afternoon light
82open cases in Bronx
57open, no activity since the report
25open, a firm worked here before
8with a sidewalk shed up - LL48 penalty risk
15UNSAFE reports

See the free Bronx sample - 5 cases See plans - from $590/yr Try the app (demo data)

Founding price for the first 10 firms, until Mar 31, 2027 · full list from $590 a year (pricing) · free monthly Bronx update

Three of the open cases, anonymized

AreaFindingSidewalk shedSizeTypical repair filings
ZIP 104xxUNSAFE, Feb 2026since Jun 2023 (40 mo)1-6 floors$45k-$234k
ZIP 104xxUNSAFE, Dec 2025since Mar 2025 (19 mo)1-6 floors$45k-$234k
ZIP 104xxUNSAFE, Oct 2025since Apr 2023 (42 mo)1-6 floors$45k-$234k

The full list names the building, BIN and DOB links, the inspection firm of record (usually the engineer who writes the repair scope and invites bidders), the managing agent and the owner entity - companies only.

Where the open cases are

ZIP areas with the most open cases in Bronx: 104xx (80).

Why owners in Bronx move now

A SWARMP or UNSAFE report obliges the owner to repair. Under Local Law 48 of 2025, sheds without work in progress can cost the owner $10 to $200 per linear foot and month, depending on the shed age; Local Law 51 adds repair milestones for new sheds. The next wave of reports is due with the Sub-Cycle 10A deadline on Feb 21, 2027. By the time a job is on Dodge or BuildingConnected, the bidder list is set - these cases are earlier: the report is filed, the scope is not. Penalties in detail · how the list is built

Other boroughs

Manhattan · Brooklyn · Queens · Staten Island

Source: NYC Open Data / NYC Department of Buildings, modified. Not affiliated with the NYC Department of Buildings; informational only, verify in DOB NOW. No commissions, no referrals.